Tuesday, May 26, 2009

Ogee Tunic Blues

I've ripped and frogged
And stitched lots of knitting.
This doggone yarn has me
Fuming and spitting.

How can I deal with this yarn
That keeps splitting?
This ogee front
Will I ever finish knitting?

I'm just not feeling the love for this yarn or design at this time. If I can just get finished with the front, I think the rest of the sweater will work out okay.

Tuesday, May 19, 2009

Happily knitting along!

I have been knitting Norah Gaughan's design, the Ogee Tunic, from Knitting Nature. Although the front of the sweater looks very complex with its meandering cables, it really is quite easy to follow the charts if one remembers to take one line at a time and carefully read the symbols. I am enjoying knitting the garment; however, I am not thrilled with my choice of yarn. The yarn is 100% bamboo, a heavy yarn with absolutely no body. My least favorite feature of the yarn is its structure. It has 14 strands (yes, I said 14 strands) with no twist, that is to say that the strands lie mostly parallel to each other much like embroidery floss. It is so difficult to avoid splitting the yarn.

I will give a progress report soon.

Sunday, March 22, 2009

Promised photos

At last, I have some knitting project photos to post.

Geese Gone Goofy Ruana




First socks -- Off the Cuff (Knit Socks! by Betsy McCarthy pg. 80ff)


Classy Slip-up Socks (Knit Socks! by Betsy McCarthy pg. 104ff)


Best Foot Forward Socks (Knit Socks! by Betsy McCarthy pg. 56ff)


Waving Lace Socks (Favorite Socks from Interweave Press pg. 104ff)


Spring Thaw Socks designed by Cat Bordhi



Arch Shaped Socks

Tuesday, March 17, 2009

Projects -- Spring is coming!

Last Friday, I finished my reversible vest (Knit One Below), although it is not really reversible. I could not figure out how to hide the yarn tails that resulted from casting on, joining yarn to knit the back and right front above the underarm, and the ends at the shoulders. There just did not seem to be any way to hide them so that the vest could truly be reversible. I did "spit splice" the yarn joins in the middle of the project, and, I must say, the joins are really invisible. It's a technique I will use in the future with any "feltable" yarn.

I have knitted my swatch for my first warm weather garment, a cardigan in garter stitch with lace lapels. It's a very simple, but practical and elegant garment. The yarn I am using is Queensland Soft Wave, an unmercerized, sport-weight cotton yarn that has a crinkled appearance somewhat like Mission Falls 1824 Cotton, although it is much more pleasant to knit. I'm a bit concerned with the strength of this yarn because it takes no effort at all to break it. The color of the yarn is a very light sage green -- very spring-like.

Friday, March 06, 2009

Reversible Vest

I am currently working on the Reversible Vest from the book Knit One Below. It is a simple project that seems to be taking an inordinately long time to complete. The stitches are wide but short, with a gauge of 4 stitches per inch and 8 rows per inch. Of course, that means that fewer stitches need to be cast on, but it takes forever to make any progress vertically. Since it is a reversible vest, I am "spit" splicing the yarn. I've never used that technique before, and I must say that I will probably employ it whenever I am knitting with feltable yarns in the future. It certainly makes the inside of the garment neater to eliminate working in yarn tails.

Another comment about the knit one below (k1b) technique: the stitches are not as even, at least in the unblocked garment, as stitches produced with stockinette stitch. I am hoping that the stitches take on a more uniform appearance when the garment is blocked.

Monday, March 02, 2009

Blogging the blahs!

I really have the knitting equivalent of a bad case of the mullygrubs. Currently, I am plodding along on a couple of winter knitting projects like a grasshopper dragging itself along at the end of summer. I'm trying to finish my Arwen hoodie and also the reversible vest in Knit One Below. They are both lovely projects, but spring has sprung in west Texas, and winter knitting is just plain dull. My fingers are itching to begin working on my spring knitting -- cotton and bamboo yarns in lovely spring colors, lacey, flouncy, fancy knitting, lovely and enticing projects. Oh, to be finished with these winter woolies! What I need is a good, west Texas norther to put me in the mood to complete these wintry projects.

Monday, February 16, 2009

Some photos added to posts

At last, I've downloaded some project photos from my camera. They are posted with the applicable articles.

Reversible hat -- "Out of hibernation" posted 1/16/09
Little boy sweaters -- "Well, I did it!" posted 12/30/08
Fall Leafy Cardigan -- "Cardigan completed" posted 9/15/08

Tuesday, January 20, 2009

Looping the loop

I have been knitting right along on the Arwen. I have completed the left front and sleeve, but not the left side of the hood. Progress on the right front is steady and fast. The pattern calls for knitting each side of the hood with the front side and corresponding sleeve; however, I think I will experiment with making the hood after attaching the fronts to the back using the live stitches that I left on the back neck instead of binding them off as the pattern instructed. I'll let you know how that goes and hopefully post some pictures of the work in progress. As you may have noticed, I am not very good at providing photos of the work or the completed projects.

Friday, January 16, 2009

Out of hibernation




This morning, bright and early, I took out my Cardigan for Arwen to resume working on it. It was a real pain to figure out where I am on the cable braid on the cuff and front edge. I think I will leave myself more copious notes next time I place a project in hibernation to work on other more urgent projects (like socks and little boy sweaters that needed to be completed before Christmas). The Elann Sierra Aran wool and alpaca blend that I am using for the Arwen is really a pleasure to work with. It just flows through my fingers in a most satisfying way.

The first week of January, I made a nice wool hat for my husband, because he is constantly complaining that his hats do not keep his head and ears warm. His new hat is quite plain, reversible, and made of merino/nylon sock yarn left over from the Christmas gift socks. He likes it. I like it. It's one of those knitting projects I will have to repeat at some time in the future.

Tuesday, December 30, 2008

Well, I did it!







This is my first post-Christmas article since I have spent much time with needles in hand since the last entry. I completed all of my Christmas knitting projects except one sock (note I said one sock, not one pair of socks) before Christmas. All of the gifts have been given, but few photographs to show for it. Comments on the gifts have been positive so far. The last package -- three sweaters, one pair of hand-knit socks, one pair of store-bought socks, and three personalized pillow cases -- was mailed out on Saturday after Christmas. This year I have competed 16 pairs of hand-knit socks, one lace scarf, three little boy sweaters, two sweaters for myself (blue-ribbon winners mind you), and just this morning a reversible hat for my husband. I started two other sweaters for myself which are my first projects for the new year -- I resolve.

Lovely friends who appreciate my knitting obsession, gifted me with cash for Christmas, which I promptly spent for some knitting items that have been on my wish list for awhile.

Now, as for 2009, I must find some way to get some exercise. I would like to do some gardening, but my space for growing things is limited. My tentative (very tentative -- as in, I have not shared them with anyone, yet) plans are to plant a few squash and cucumbers outside our fence in the alley, plow a plot in the back yard for beans and peas, and plant a few tomato plants, peppers, and eggplant in the front "flower bed." I am also looking at continuing education opportunities both for work and for personal growth. The Dallas/Fort Worth Fiber Fest in April looks enticing, especially Suzanne Thompson's "SEVENESS" class and her polymer clay buttons classes. I've also been toying with the idea of entering the Master Knitters program. It would be a challenge, but I just don't know if I want to get that academic with my knitting.

Enough for now!

Monday, November 17, 2008

Why! Why! Why!

I have done it again -- committed to myself to knit more than I can complete in the time allotted for the projects. I started with a seemingly managable project, making a pair of socks for each female coworker and family member on my Christmas gift list. I started back in March and I've made good progress toward the goal, having only two pairs or maybe three pairs of socks to complete. However, my daughter wants me to make each of my little grandsons a sweater for Christmas. I only found out about this a month ago. There are three little boys ages 4, 2 and 8 months. I started with the sweater for the oldest grandson, but it is taking longer than I estimated, so I'm afraid I won't finish by Christmas. My only hope is that the two smaller sweaters will not take as long as the first one. The first one is made in pieces, but I'm planning to make the other two with fewer seams. Actually, the first sweater is not the first sweater. I started with a sweater for the middle child, but it looks too small to layer over a shirt. That's okay, I can always gift it to a charitable organization since it is a perfectly darling sweater.

The most troubling aspect of running short on time to complete a task is that the process leaves me weary of knitting rather than excited and energized as I usually am. Oh well, I'll get over it when I complete the planned projects and get to knit what I want to knit.

Monday, September 22, 2008

Y-E-S

Last Wednesday, I took two items to enter in the Panhandle South Plains Fair. One was the Leafy Fall Cardigan which I entered in the division for knitted sweaters. The second is my Geese Gone Goofy ruana, a knee-length wrap made of fingering weight yarn. It is knit so that there are diagonal stripes, and all in garter stitch. I figured that I knit a bit more than a mile of yarn into the rauna, but because the yarn is light weight, the garment is drapey and light, very comfortable to wear. I entered it in the knitted coats division.

Yesterday, I went to the fair to visit my sweaters. I have never before even considered entering anything at the fair. I was really surprised to see that both garments received blue ribbons. I will post pictures as soon as I have them ready.

Monday, September 15, 2008

Cardigan completed




This morning, I completed my leafy fall cardigan. It is beautiful. I like the derived design made by combining features of Jean Frost's Hanover jacket and Ruthie Nussbaum's Minimalist Cardigan and adding a couple of features that were my own design elements. I really like the result and the yarn is soft and drapey. I hope to have some photos posted tomorrow. (Pictures did not show the garment well, so I'll have to try again.)

Friday, September 12, 2008

Sock woes

Several days ago, I got as far as the middle of the leg of the second sock when I decided to suspend working on it because it will not be suitable to be a fair entry. The reason for its current status is that the socks are for me and therefore, the left leg must be larger than the right leg due to my lymphedema. So---, I have started a second pair of almost "Spring Thaw Socks" for the fair. These are made from Paton's Stetchy Sock yarn, very like the Dancing yarn that Knit Picks used to carry. The colors in the ball look sort of like old bubblegum stuck to the bottom of a desk. When the yarn is knitted, the color blend really comes alive with purples, greens, cream, pink. Unfortunately, because the yarn is multicolored, the leaves don't show up as well as they do with solid colored yarn. I have begun the outer spiral of leaves over the knuckle of the great toe instead of in the middle of the top of the foot, and I am eliminating the inner spiral. So far, I like the derived design a bit better than the original. I'll just have to wait and see how it turns out.

I really need to complete the "Leafy Fall Cardigan" by assembling the pieces. All the knitting is completed and the pieces have been blocked. It will be a lovely, soft, colorful sweater -- perfect for cool fall days and a great addition to my wardrobe -- I hope. I have not yet tried on the sweater, so I don't know how it will fit me. Perhaps, sewing the cardigan together will be my craft night project for tonight.

Wednesday, September 03, 2008

One sock down ...

Last night I completed the first sock of the pair of Spring Thaw Socks. There is absolutely nothing boring about knitting this pattern. Just as you are about to complete one leaf, you have to start the next one. On the leg portion of the sock, one may be working on as many as three leaves at once, all at different stages in the chart.
For the first time, since this is the first time I've knitted socks toe-up, I bound off at the top of the sock. The pattern called for using the tubular bind-off. It was a bit of a challenge to figure out the tubular bind-off, and a bit more of a challenge to ensure that the sock top would fit around my leg. I measured my calf and then found a can (a tuna can) in the pantry that had the same circumference as my calf. I bound off most of the sock making sure I left it somewhat loose, and then inserted the tuna can and completed binding off. It worked well.
Now, what will I do for the other sock? Because I have lymphedema, my left leg is 4 inches larger at the sock top than my right leg. I may have to go up a needle size on the leg of the left sock. I don't usually have to make any adjustment; however, as I've said before, this is the first pair of toe-up socks I've made.

Tuesday, September 02, 2008

Sh-sh-sh! Christmas gift socks



The photo above is a pair of socks I have knitted as a Christmas gift, one of eight pairs knitted so far since March. I won't say who they are for because I do want them to be a surprise. The leg of the socks is the maple seed spiral stitch pattern Angela Hahn used on a hat she created. I think the pattern comes from one of the Barbara Walker books; however, I haven't found it yet. I intended to continue the spiral onto the instep, but that does not work out. The maple seed spiral stitch pattern is a simple 4-row sequence that is very easy to memorize. On the left sock, the pattern spirals one direction and on the right sock, the pattern spirals the opposite direction.

Friday, August 29, 2008

Socks defrosted

No, I am not finished with my cardigan, but I have started the Spring Thaw Socks. Wow, what a fun knitting project and what a gorgeous design. This is the first pair of toe-up socks I have made. Instead of using Judy Becker's Magic Cast-on that Cat Bordhi called for in the pattern, I used the Turkish Cast-on. All I can say is that it's amazing to take yarn wrapped around two needles and begin knitting. The toe looks great, continuous, seamless, uninterrupted stitches. I struggled a bit with the increases and frogged the toe when I discovered that the increases did not look symetrical because I had not done them correctly. After about 20 false starts, I finally succeeded in getting the first sock started yesterday (8/28/08) morning. I made good progress, yesterday. This is not a design for the faint-hearted, but I think it will be rewarding to successfully complete it.

And yes, I will complete the cardigan. I am very good at finishing projects that I start. That's what I say, and I'm standing by it!

Wednesday, August 27, 2008

No joy in Mudville

On Monday, August 25, I completed the second sleeve. Yesterday, I frogged the back neck trim because of an error at the shoulder seam. I have reknit and attached half of the neck trim and will try to redo the other side tonight. I should have the sweater completed by Friday night. It seems, I just cannot break the 3-week barrier.

I have started the Spring Thaw socks, my first pair of toe-up socks. They are lovely, but the increases don't match. I'll have to re-examine that technique, and maybe frog the sock. The twisted ribbing really looks neat, much better than my regular one-by-one ribbing.

I hope to get some photos posted this week.

Friday, August 22, 2008

Ouch! Sore muscles

Who knew knitting could be such strenuous exercise. I am sore all over from sitting and knitting. I finished the first sleeve this morning, washed it and blocked it. It is drying at this time. I don't see any possibility of completing the cardigan before the end of the closing ceremony. Oh, well! I will probably get it finished on Sunday afternoon. This is a record for me. My previous record for knitting a sweater was three weeks, and that was for short-sleeve, mostly stockinette sweaters, albeit made with skinny yarn. I am quite pleased with my work on this, both the design and the knitting. The yarn has been great to work with and I like my hybridized design. I'll put some progress photos up tonight or tomorrow and a finished photo on Sunday.

Thursday, August 21, 2008

Sailing right along ...



On Tuesday night (Aug. 19), I finished the fronts of my cardigan, attached the fronts to the back, completed the back neck trim and tucked in all the yarn ends. On Wednesday morning, I cast on for the first sleeve and as of this morning, I was up to the elbow. Also, this morning, I blocked the bodice of the sweater. Blocking it required quite a bit of scrunching to conform it to the measurements. It really looks beautiful to me. I'm thinking more and more that this cardigan will be entered into the fair. I've never entered any projects in the fair (Panhandle South Plains Fair), but this seems a likely candidate. My Geese Gone Goofy ruana may also be entered once I redistribute the yarn that got caught in a brooch while hanging in my closet -- reminder that I need to post photos of this project.